Emergency Action Plans

Emergency action plans are presented here for your perusal. Please read the plan that is appropriate for your building BEFORE an emergency situation comes into play. The life you save could be your own, a total stranger's, a co-worker's or a firefighter's.

Please take a few minutes to read the Emergency Action Plan, listed below, pertaining to your building.

 

Elvey EAP Quiz

Elvey Roof Access

Access to the Elvey Building roof is overseen and approved by the GI Operations Office Manager.

The University of Alaska Fairbanks (UAF) has restricted access to all UAF building roofs for security/safety reasons.

Due to the nature of research projects that are conducted at the Geophysical Institute (GI), GI has been granted conditional, restricted access to the Elvey Building roof.

Vehicle Use

Sec. 44.68.040 states that an employee who violates this regulation is subject to dismissal from State employment upon hearing for other dismissals for cause.

Policies

See web page descriptions for

  • Key policy
  • Vehicle use policy

See attachements below for PDF documents on

  • Gun use policy
  • Key policy
  • Room policy
  • Telephone policy

Field Sites

Field Sites and Visit Requests
The Operations Office is responsible for maintenance of Field Sites associated with the Geophysical Institute and some of the grants and contracts administered by the institute. These sites include facilities located at:

People

Online directory downloadable file - the file below is generated daily. Open the link to phonelist.txt (ASCII text file for Geophysical Institute)

  
Enter any part of a person's name or the
first few letters of the Office name

Power and Unterruptible Power Supplies

Power for all of the building and facilities at CIGO is provided by the UAF Utilities and has proven to be very reliable. It is under the control of the UAF Electrical Engineer at the Utilities Operations (474-5600). No changes or modifications are permitted on the primary or secondary lines without consultation with the UAF Electrical Engineer and approval from FS DD&C and the CIGO Project Manager.

Communication and Fiber Optic Cable Management

Management of the fiber optic cables between the Control Building and the Interface Building is under the control of the UAF Communications Engineer with UAF Utilities (474-6902).

The engineer has authority for the telephone channel bank and communication cables. No changes or modifications are permitted in the fiber optic cables, other communications cables or the telephone channel bank without consultation with the UAF Communications Engineer and approval from FS DD&C and the CIGO Project Manager.

Key Policy

Geophysical Institute (GI)/ University of Alaska (UAF)

Effective date: January 1, 2012

Operations Office

  • Policies
  • Services
  • Training
  • Support

 

Building Emergencies: Regular hours 8am - 5pm, Monday - Friday, call ext. 7291 or 7411;
After hours & weekends call ext. 7000

Health & Safety Emergencies:  Call 911

UAF is an AA/EO employer and educational institution. Last update Winter 2010 by Webmaster.
Copyright © 2010 Geophysical Institute, University of Alaska Fairbanks.